Sunday: Day of much needed rest.
Saturday: Worked on the Bollock knife, Polishing the blade and rough shaping the handle.
Sunday, November 29, 2009
Friday, November 27, 2009
Thursday, November 26, 2009
Wednesday, November 25, 2009
How goes it
Yesterday I worked on the body of the heat treat forge today I need to weld the body put in the insulation, and attach the burners. I'll post pictures and a video when it is finished. After this forge I still have a welding forge, vacuum caster, and a 2"x72" grinder to build before I'm finished with my shop upgrade, after that I hope to begin pattern-welding.
At the moment I have 4 projects that I'm hoping to finish by the end of the year.
1. Ballock knife, a commission.
2. Falchion (the one in the drawing), also a commission.
3. early 1700's Cutlass.
4. German Grosse Messer.
Pray I get it all done.
At the moment I have 4 projects that I'm hoping to finish by the end of the year.
1. Ballock knife, a commission.
2. Falchion (the one in the drawing), also a commission.
3. early 1700's Cutlass.
4. German Grosse Messer.
Pray I get it all done.
Tuesday, November 24, 2009
Dual burner
Yesterday I built a dual burner for the heat treating set up I'm building. My currant setup is a horizontal drum forge. The new one will be a vertical configuration to help with keeping blades straight. Here is a video of the test.
Sunday, November 22, 2009
Falchion sketch
Saturday, November 21, 2009
First post
Subscribe to:
Posts (Atom)